Chained inspectors: run one inspection as soon as the prior one completes
future consideration
D
Dylan Barth
Sometimes I want to guarantee that data from one inspection is tightly correlated to data from another inspection. As an example, if I run the domain inspector, I want to run the TLS/SSL inspector immediately following that inspection, so that the metrics I pull from these timelines are very close in time.